Advertisement

Member Login

Like this Page?


Follow Us
Follow us on twitter. Follow us on LinkedIn. Follow us on YouTube.
Our Feeds
Repository RSS. Forum RSS. User Comment RSS. News RSS.
Contact Us
post/email Forum or Email
telephone US +1 617 5008224
telephone EU +44 113 8152220
telephone Toll Free: Skype
Live Chat Live Chat

Who's Online

We have 38 guests and 42 members online

Total Downloads

182593


Enter Amount:


Home arrow Premium Services arrow Engineering Services arrow Bolt Failure Investigation
Signup Now! Subscribe, login and start downloading. Latest Calculations! Follow us on Twitter.

ExcelCalcs Lego-Like Way to Engineering

Like a child selecting parts to construct a Lego model engineers bring together blocks of science to create new designs. These building blocks could be a load calculation, a beam calculation, a weld calculation, a fatigue calculation or any other calculation from a myriad of engineering topics. As...

iPhone, Android and Mobile Device Access

The site is optimised for browsing on mobile devices like the iPhone or Android phones. To create a web app icon browse to http://www.excelcalcs.com/navigate/ and ‘Add to Home Screen’. You will find an icon much like an app icon on your home screen which will bring you straight back...

ExcelCalcs Trailblazers

I have been chasing up feedback from new users signing up to XLC Pro accounts in the last month. I am delighted with their positive feedback. “I started using XLC but I am now insisting that my whole team use the add-in .“ “It is a great tool for validation and pres...

Increasing Engineering Confidence

Engineering training - “I run a team of engineers and whilst there are plenty of soft options for training expounding the latest management techniques there is precious little to develop the engineering skills of my team”. This is a familiar story we hear from clients of our trai...

Join our Corporate Partners Scheme

You are probably familiar with our tools of mass knowledge distribution on our website but ExcelCalcs also works more closely with corporate partners providing engineering training and engineering consultancy services. What’s more these services and ExcelCalcs subscriptions are availa...

Introducing ExcelCalcs eFormulas

ExcelCalcs eFormulas aims to replace traditional engineering formula books providing innovative functionality to copy from our webpages and paste directly into Excel. Once in Excel it is easily edited to suit your own problems this functionality is far more flexible than 'stuck on the web'&n...

Deciphering Spreadsheets with XLC

At some time or other you will have been given someone else’s spreadsheet only to be left scratching your head not having a clue as to what the calculation is doing.  If you are wise you will not use it because you can’t understand it. If you are wiser still you’ll use our...

Make Amazing Calculations

In our good calculation guide we emphasise the importance of sketches in calculations but you can produce interactive 3D wireframe sketches by incorporating Turan Babacan’s latest upload. Turan uses 3D charts to great effect in his Excel FEM programs. Andy Pope also has a 3D chart spr...

Coming Soon XLC Ribbon

A new version of XLC is in the final stages of development which will be compatible with the 64 bit version of Excel 2010 (currently it works with the 32 bit version of Excel 2010, 2007 2003 and 2000). We’ll keep you posted with progress. Please send us details of any features you ...

Bolt Failure Investigation

DESCRIPTION OF THE FAILURE

As always our approach is to propose solution found through understanding the mechanics of failure. A railway vehicle antennae raft is cantilevered the bogie transom by 4 M16 bolts. The bolts had repeatedly failed in service and was considered a severe hazard as a detached raft could in a worst case scenario derail a train and result in loss of life. MoreVision were invited to investigate the failure. The bolt samples were sent to a metallurgical laboratory and examination of the bolt fracture surfaces showed all the characteristics of a fatigue failure. The bolts were renewed every month as a risk mitigation action until the investigation reported its conclusions. MoreVision initially performed bolt fatigue calculations using the loading assumed in the design case. The calculations did not predict a bolt failure so it was suspected that the actual service loads were greater than that assumed for design purposes. Another possibility was that some element in the bolted joint was relaxing giving rise to loss of bolt pretension and a premature fatigue failure.

DESIGN AND CALIBRATION OF STRAIN GAUGE BOLTS

After disappointing performance with commercially available bolt sensors MoreVision devised and produced special test bolts by introducing flats on the shank of the bolts and attaching standard linear gauges (photo on the left). The bolts were calibrated in a laboratory load cell shown in the photo on the right.

BOLT RELAXATION TEST

The test bolts were installed on a stationary vehicle in a depot. During installation the load in the bolt was measured as the bolts were torqued up. The bolt force was measured for a number of hours to see if any element in the joint would relax resulting in a significant loss of bolt pretension and premature fatigue failure. The test concluded that relaxation of the joint was within normal acceptable levels and the threat of bolt pretension loss was ruled out.
DYNAMIC 'HAMMER' TEST

Whilst the the vehicle was stationary in the depot the antennae raft was struck with a rubber hammer allowing the raft to vibrate. The response was also seen by the bolt sensors. A spectrum analysis of the bolt test signals illuminated the frequencies associated with the natural modes of vibration. Closer examination of the phasing of the time signals showed the fundamental 'springboard' mode directly (see plot on left).


ON-TRACK TESTING

The data acquisition equipment and computer were installed in the drivers cab. A test route of over 200miles was considered representative of normal service. It was even possible for the train to remain in service as the data was acquired which helped the client maintain his train availability and service levels.

POST-PROCESSING OF TEST SIGNALS
1) FILTERING NOISE
When all the train systems were started up in the depot it was noticed that some noise was picked up by the strain gauges. The characteristic of this noise was very high frequency (greater than 500Hz). The hammer test has shown that the predominant structural frequency was less than 50Hz so frequencies of over 200Hz were taken out using software filters.
2) DAMAGE CALCULATION
The filtered signals were the assessed using rainflow counting techniques to reduce the signals to stress histograms. The fatigue life could be calculated from the stress histograms.

CONCLUSION
Local vibrations due to the resonant response of the raft resulted in higher levels of load than was assumed in the design loadcase. This gave rise to a premature bolt fatigue failure.

SOLUTION
MoreVision working together with the depot mechanical engineering team devised an end support bracket for the antennae. MoreVision prepared a finite element analysis justification for the new end support bracket together with revised bolt calculations and the solution was also proven by further on track testing.

 