Advertisement
ExcelCalcs
Welcome, Guest
Please Login or Register.    Lost Password?
Stack anchorage to foundations (1 viewing) (1) Guest
You can request specific calculations in this area. Hopefully someone in the ExcelCalcs community can help.
Go to bottom Post Reply Favoured: 0
TOPIC: Stack anchorage to foundations
#970
RayK877 (User)
Fresh Boarder
Posts: 1
graphgraph
User Offline Click here to see the profile of this user
Stack anchorage to foundations 4 Months, 4 Weeks ago Karma: 0  
Does anyone know of a spreadsheet that aids in designing anchor bolts for a chimney stack to a foundation? The bolts are in a large cicular patern so it should be able to provide bolt tension.
 
Report to moderator   Logged Logged  
  The administrator has disabled public write access.
#971
JohnDoyle (Admin)
Admin
Posts: 411
graph
User Online Now Click here to see the profile of this user
Gender: Male MoreVision Location: LEEDS, WEST YORKSHIRE, UK Birthdate: 1965-02-24
Re:Stack anchorage to foundations 4 Months, 3 Weeks ago Karma: 470  
I think if you use the Search ExcelCalcs box at the top left hand side of the site with the work "bolt" it will return a number of calculations which I think will be of help:

Try one of Alex Tomanovich's spreadsheet (all his work is brilliant): http://www.excelcalcs.com/repository/Machines/Bolts-and-Threads/BOLTGRP.xls/

Probably the worksheet call "Bolt Group(<=25)" will be of use. Cell AE29 shows how to arrange a circular pattern of bolts. I hope this does the trick.
 
Report to moderator   Logged Logged  
 
Last Edit: 2008/02/27 21:15 By JohnDoyle.
 
Talk to me about training.
Talk to me about engineering consultancy work and finite element analysis.
  The administrator has disabled public write access.
Go to top Post Reply