exploded BOM (Bill of Materials)
 

This Excel calculation can be downloaded by ExcelCalcs subscribers.Please login or Subscribe.

Description:
Multiworkbook application for managing simple bill of materials (BOM). Single level BOM's define multilevel assemblies, and can be exploded into an indented list. Different workbooks can be used to define materials and assemblies used. Pressing ctrl-shift-E whilst in the materials list will bring up a dialogue box which permits jumping from one subassembly definition to the next, based on which item in an assembly is selected. This is an extension and rewrite of the earlier versions. The earlier versions used VLOOKUP and descriptions, this version only makes use of the integer code numbers to define assemblies. Potentially useful to students of IE/POM/CAPM.

 

Version History
Subscribe to this topic and get notified by mail about new posts Favorite to this topic Discuss this item in the forum. Check the version history to see how this calculation has changed over time. Use the Subscribe button to receive an automatic email should this calculation be updated to a higher version. Use the Favourite button so you can easily find this calculation in the future.

Submitted On:
02 Sep 2010
Submitted By:
InfoJunkie65
File Date:
29 Aug 2010
File Author:
Conrad Harrison
File Version:
1.0
File Size:
347.52 Kb
File Type:
zip
Downloads:
61
Rating:
stars/0.gifTotal Votes:0
HTML Link:
Copy code below to your web page to create link to this page:
HTML Window:
Copy code below to your web page to create a dynamic window to this download:
Like This?:
View the profile of the person who submitted this calculation and see all their other calculations hosted at ExcelCalcs.
Need Help?:
Use the comment feature below to raise any questions relating to this download. The question will be automatically emailed the author and all users subscribing to this comment thread.

Comments  

 
#1 InfoJunkie65 2011-03-15 04:56
A recurring problem. Working through individual low level BOM's is time consuming in Excel. I therefore attempt to move away from exploded indented BOM's and try alternative approaches. But then end up with different tables for different types of items. The idented BOM is more consistent: but its vertical format is wasteful of paper. Also at the end of the day, I do need simplified separate tables to match the type of item, and provide relevant additional information for.

The problem is that alternative workbooks, produce a complexity of cell formulae which are not easy to follow and trace back to the built up components and aggregate gross quantities required. Also no graphics.

The typical result is I scrap the workbooks, grab some coloured pens and paper and work out manually: with simple symbolic sketches of parts quantitifying. Yet ultimately I end up manually writing out an indented BOM for various parts of the building assembly.

I know what the VBA does, and it does it consistently. Where as alternative cell formula can be inconsistent and need to change from job to job.

I guess some things are best started with a blank piece of paper every time.

I do have AdvancedBOM but that does do all that is required, nor have the flexibility of Excel. For the few occassions that have to do such things cannot justify more complex system.

So really need to develop a more user friendly interface to using this explodedBOM workbook: but that also takes time.

The benefit of using Excel is that I can calculate dimension of parts in Excel and link into the BOM. I can also do structural analysis in Excel and also link section size into the BOM.

At moment not sure what it needs. A visual tree would help. AdvancedBOM has that but still something lacking, with respect to defining assemblies.

Seems to be more work than necessary when only making small variations on a theme. Maybe its just me, just got to be in right mood and have focus on task.

Any ideas would be helpful.
 

Please sign in or register to add a comment.

We have 14 guests and 42 members online
Contact Us
post/emailEmail (preferred method of contact)
telephone US +1 617 5008224
telephone EU +44 113 8152220
Our Feeds
Repository RSS. Forum RSS. User Comment RSS. News RSS.